The team filled two potholes on Al-Arbaeen Street and patched them with cold asphalt, covering about two square metres.
The team filled two potholes on Al-Arbaeen Street and patched them with cold asphalt, covering about two square metres.
The association’s volunteers built a bus shelter at the Khalaf Roundabout and opened it to serve local residents.
A clean-up campaign carried out by the association’s volunteers at the Khalaf Roundabout.
We prepared about 13 pits ready for planting, using mechanical and hand diggers.